Veteran owned and owner operated. Manchester, Tennessee.Call or text 931-636-7713
S&S Excavationand Hauling, Manchester TN
Freshly cleared and graded red clay hillside below a gray house on the ridge

Home / Services / Site Prep and Building Pads

Site Prep and Building Pads That Stay Put

A building pad has three jobs: be level, stay put, and keep water away from what sits on it. We take a raw lot from trees to a compacted pad your builder or concrete crew can start on.

S&S Excavation & HaulingManchester, Tenn. · Veteran owned · Owner operated931-636-7713

From raw ground to ready

Site prep pulls several jobs into one: clear the trees and stumps, strip the topsoil and set it aside, cut the high side and fill the low side, compact the fill in lifts, and shape the ground so rain runs away from the pad instead of toward it. Doing it as one job with one operator means nobody is blaming the last guy when the pad settles.

CAT D4 dozer spreading a wave of loose red dirt across an open cleared site
Spreading fill across an open site, one pass at a time.

Hillside lots

A lot of Middle Tennessee building happens on slopes, because that is where the views are. On a hillside the pad usually comes from cutting a bench into the high side and using that dirt to build out the low side. The fill side is where problems start if it is pushed in loose. It has to go in thin layers, each one compacted, and the finished slope below it has to be shaped and covered so it does not wash.

The photos on this page show that kind of job: a wooded hillside below a house, cleared, cut and shaped down the slope.

Low view up a cleared red clay hillside with a mossy rock in the foreground and a house on the ridge
Looking up the same hillside from the bottom. The rock stays where it sits.

Drainage is part of the pad

On the Highland Rim around Manchester and Tullahoma, a lot of soils have a fragipan, a dense layer a couple of feet down that water does not soak through. Water sits on top of it and moves sideways, and it will find a basement or a crawlspace. We grade so surface water leaves the pad, and we will point out when a site needs a curtain drain or swale to catch water coming downhill.

Permits on bigger sites

If a project disturbs an acre or more of ground, Tennessee requires coverage under the TDEC construction stormwater permit, with silt fence and a stormwater plan. Most single house sites are under that, but a long drive plus a house plus a shop can add up. Cities like Murfreesboro, Manchester and Shelbyville also have their own land disturbance or grading permits. We flag what applies when we quote.

Site Prep and Building Pads near you

We do this work from Manchester across Middle Tennessee. Each town page covers the ground, permits and burn rules there:

  • Manchester, TN: Home base. Rim ground, chert and fragipan, the Duck and Little Duck.
  • Tullahoma, TN: Flat rim lots, chert gravel, and drainage that has to be built in.
  • Murfreesboro, TN: Shallow limestone, cedar glades, city permits and no burning.
  • McMinnville, TN: Overgrown nursery ground, Plateau slopes and limestone with sinkholes.
  • Shelbyville, TN: Horse and cattle pasture, cedar in the fence rows, barns and arenas.
  • Winchester, TN: Tims Ford lake lots, ridge homesites and TVA shoreline rules.

Read more

Site Prep and Building Pads: questions

How long should a fill pad settle before building?

A pad built in compacted lifts is ready far sooner than one pushed in loose and left to settle. Your builder or engineer sets the standard; we build to it.

Do you build the pad to grade for the concrete?

We bring it to the grade your builder or concrete contractor gives us. Final fine grading for forms is often done by the concrete crew.

Can you put in the driveway at the same time?

Yes. It is usually cheaper to cut in the drive while the machines are already on site.

Do I need a stormwater permit?

Only if the work disturbs an acre or more, or is part of a larger development. Some cities have their own thresholds. We tell you what applies to your site.

Talk to Larry about site prep and building pads

The fastest way is a phone call or a text with a few photos. You will be talking to the owner, and you will get a straight answer about what your job needs.

Call 931-636-7713

Or text photos to 931-636-7713

Helpful to include: where the land is, rough acreage, what you want it to be when it is done, and whether the stumps need to come out.

Your number is used to call you back about this job and nothing else.
Call 931-636-7713Text photos